Wash and Brush Up

Wash and Brush Up

Release date : January 2, 1953
Runtime : 26m
Countries of origin : United Kingdom /
Original Language : English /
Director : Tony Thompson /
Writers :
Production companies : British Transport Films / Data Film Productions /
January 2, 1953 26m United Kingdom Documentary English More
0
User Score

Overview

Number 73020, a standard Class 5 locomotive, has been in traffic for sixteen days, and goes back to the sheds for cleaning inside and out and a detailed mechanical check-up. A team of men, each with his special job, takes over. Before they are reassembled, the parts are inspected; then steam raising begins again. After vacuum tests by the crew, coal is taken on, water topped up, and less than twenty-seven hours after entering the sheds 73020 is back on duty.
More »

Top Billed Cast

More

Recommendations

More
Gladiator II
Action Adventure Drama
Sonic the Hedgehog 3
Action Science Fiction Comedy Family
Red One
Action Fantasy Comedy
Mufasa: The Lion King
Adventure Family Drama Animation
Carry-On
Action Thriller
Nosferatu
Horror Fantasy
Anora
Romance Comedy Drama
Venom: The Last Dance
Action Science Fiction Adventure Thriller
Wicked
Drama Romance Fantasy
Kraven the Hunter
Action Adventure Thriller
Gladiator
Action Drama Adventure
The Substance
Horror Science Fiction Drama
The Wild Robot
Animation Action Science Fiction Family
Moana 2
Animation Adventure Family Comedy
Werewolves
Action Horror Thriller
The Order
Crime Drama Thriller
Culpa tuya
Romance Drama
Superman
Action Adventure Science Fiction
Heretic
Horror Thriller
  • title:Wash and Brush Up
  • status:Released
  • Release date: 1953
  • Runtime:26m
  • Genres: Documentary ·
  • Countries of origin: United Kingdom ·
  • Original Language: English ·
  • Director: Tony Thompson /
  • Writers:
  • Production companies: British Transport Films · Data Film Productions ·
  • Overview:Number 73020, a standard Class 5 locomotive, has been in traffic for sixteen days, and goes back to the sheds for cleaning inside and out and a detailed mechanical check-up. A team of men, each with his special job, takes over. Before they are reassembled, the parts are inspected; then steam raising begins again. After vacuum tests by the crew, coal is taken on, water topped up, and less than twenty-seven hours after entering the sheds 73020 is back on duty.
Search history
delete
Popular search